Island-wide Rehabilitation and Repair of Puerto Rico’s
Waste Water System

Client:

PR Aqueducts and Sewer Authority

JRT Scope:

To upgrade the island-wide system to meet current Clean Water Act discharge standards (including secondary and tertiary standards)

Project Highlights.

  • Half of the island under EPA arrest before project commencement
  • Worked in more than 50 municipalities
  • More than 100 waste water treatment plants rehabilitated
  • More than 600 pumping stations rehabilitated
  • Engineering and construction management input
  • Preparation of scope of work for each of the plants
  • Preparation of specifications and construction drawings
  • Preparation of monthly summary reports to the US Federal Court
  • Design management of more than 20 local firms
  • Construction work performed by more than 30 local contractors
  • Estimated present value cost of project: $800,000,000
  • Cash flow of more than $1 M per week